Tel: +33768734502 | Email: opusprojectmaneger@gmail.com.

Practical reference material covering the planning, preparation and execution of major yard-period and structural work.
Pre-Arrival, Port Movements & Yard Entry
Planning vessel arrival, berth and yard access, contractor mobilisation, documentation and readiness before work begins.
Docking, Lifting & Dry-Dock Planning
Docking plans, lifting arrangements, block positions, load considerations, preparation, coordination and safe execution.
Hull, Steel & Aluminium Structures
Structural inspection, corrosion, deformation, plate assessment, repairs and coordination with Class and survey requirements.
Welding, Plate Replacement & NDT
Preparation and control of structural repairs, welding procedures, material replacement, NDT and final acceptance.
Paint, Coatings & Antifouling
Surface preparation, blasting, coating systems, environmental controls, inspection, antifouling and final finish.