Technical Systems

Technical reference material covering the principal engineering systems encountered during yacht refit, repair and maintenance.

Machinery, Engines & Generators
Main propulsion, auxiliary machinery, generators, maintenance planning, inspection and commissioning.

Electrical Systems & Megger Testing
Electrical installations, insulation resistance testing, distribution, documentation and verification.

Plumbing, Valves & Water Systems
Pipework, valves, potable water, waste systems, testing, commissioning and as-built documentation.

Hydraulic Systems, Steering & Deck Machinery
Hydraulic power, steering systems, cranes, passerelles, windlasses and other deck machinery.


 

© 2026 OPUS Project Management. All rights reserved.

OPUS       Yacht Refit & Technical Project Management